Sunday, August 30, 2015
Started prepping the bathroom for later down the road.
Pulled out shower doors and all the ceiling and floor trim. Eventually will tear out privacy wall.
Got into the wall to look at wiring. Bathroom will need to be redone.
Took all the wood paneling off of pantry and kitchen back wall.
Removed all the wood paneling from pantry and back wall.
Luckily there was sheetrock behind paneling. If it is salvageable is another question.
Removed kitchen cabinet uppers.
My nephew helped me take the uppers out, thanks James!
Tuesday, July 28, 2015
Starting to take out kitchen cabinets.
Removed all the cabinet molding. Ready to take the upper cabinets down.
Back bedroom work.
All those nails I have to pull.
Done pulling nails. The dark floor is existing subfloor that I am keeping.
Start of kitchen pantry removal.
Got all the shelving and bracing removed.
Sheetrock removed from load bearing wall.
This wall is going to have to be reinforced.