Nicks Home Renovation

Tuesday, July 28, 2015

Starting to take out kitchen cabinets.




Removed all the cabinet molding. Ready to take the upper cabinets down.



Posted by Unknown at 8:43 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Back bedroom work.

All those nails I have to pull. 



Done pulling nails. The dark floor is existing subfloor that I am keeping.
Posted by Unknown at 8:40 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Start of kitchen pantry removal.



Got all the shelving and bracing removed.

Posted by Unknown at 8:35 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Sheetrock removed from load bearing wall.

This wall is going to have to be reinforced. 



Posted by Unknown at 8:33 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Opening up the wall.

Previous owner cut through the top plate for air return.




Posted by Unknown at 8:31 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Removed the heater vent and closet

Old floor heater vent 
Closet and vent removed.


Posted by Unknown at 8:29 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Going to take out arch and square off.



Posted by Unknown at 8:25 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

About Me

Unknown
View my complete profile

BLOG POSTS

  • ▼  2015 (33)
    • ►  June (12)
    • ►  July (10)
    • ►  August (4)
    • ▼  December (7)
      • Retaining wall in crawl space to support the new...
      • Found this guy under the house.
      • Framed in new doorway between living...
      • Installed recessed lights in kitchen. The beam a...
      • Oven gas pipe ran behind that duct and went up...
      • Second bedroom floor needs to have subfloor plan...
Picture Window theme. Theme images by andynwt. Powered by Blogger.