Sunday, December 6, 2015

Second bedroom floor needs to have subfloor planks replaced.


Ready for new subfloor.

Oven gas pipe ran behind that duct and went up through the floor to the kitchen. So in order to move the range to another wall I had to cut the old gas line so i could reroute it.

Starting point for new line off of old gas line.


New routing of gas line for range.

                                                    New stub out for gas line to the range.
Installed recessed lights in kitchen. The beam across the room was hallow so I will be able to remove it and patch with sheetrook.



Framed in new doorway between living room and kitchen.
















Found this guy under the house.



New floor duct return boot. This section of ducting was on the ground in pieces.


Put the cross braces in on the floor joists.


New bracing and sealed connections.



Starting to repair subfloor planks.









Wall between bathroom and master bedroom.




Framed a door entry so the master will have a door into the one bathroom in the house.














So the 2x4 in this pic is not supporting anything the previous owner had nailed it to the subfloor planks and had the plywood from the other side resting on it. So I had to cut all this floor away. Which was good because I found the bathroom duct was not even connected.














Retaining wall in crawl space to support the new house piers.

Finished wall. Hole in the floor is where the floor furnace was that I removed.