Sunday, December 6, 2015

Second bedroom floor needs to have subfloor planks replaced.


Ready for new subfloor.

Oven gas pipe ran behind that duct and went up through the floor to the kitchen. So in order to move the range to another wall I had to cut the old gas line so i could reroute it.

Starting point for new line off of old gas line.


New routing of gas line for range.

                                                    New stub out for gas line to the range.
Installed recessed lights in kitchen. The beam across the room was hallow so I will be able to remove it and patch with sheetrook.



Framed in new doorway between living room and kitchen.
















Found this guy under the house.



New floor duct return boot. This section of ducting was on the ground in pieces.


Put the cross braces in on the floor joists.


New bracing and sealed connections.



Starting to repair subfloor planks.









Wall between bathroom and master bedroom.




Framed a door entry so the master will have a door into the one bathroom in the house.














So the 2x4 in this pic is not supporting anything the previous owner had nailed it to the subfloor planks and had the plywood from the other side resting on it. So I had to cut all this floor away. Which was good because I found the bathroom duct was not even connected.














Retaining wall in crawl space to support the new house piers.

Finished wall. Hole in the floor is where the floor furnace was that I removed.


Sunday, August 30, 2015

Toughest part of this house was the main support beam was sagging in three spots. It was in much worse shape than I had thought and it has to be addressed.


 These pictures show the first part of the job of redoing the supports for the main house beam. I will finish the second and third part at different times. 


So I bought 3.5 ton rv jacks because the space from the ground to beam was only 6.5 inches. Unfortunately this was no where near enough weight to lift a section of a house. 

Small spot where previous owner dug out enough space to sit up and work. Silver box is old in floor furnace, still deciding if i want to mess with removal?

Main support beam left side of the house. I need to put a secondary support there because the beam is sagging there a full inch. Hard to tell in the photo.
First jack is 6 ton. Not enough I would soon find out. 
Found a black 20 ton stubby jack at Lowes so I bought a couple. Worked like a charm! These two jacks lifted that beam around an inch.

New 6 x 6 Support post is in place. 
Hard to tell but that is a cement block on a poured cement pad. This is one of two primary supports that need to be raised. The scissor jack is no match for this project.
So this a stubby jack on the right side of the primary support.

You can see in this picture the new solid concrete block and wood shims I put in place of the old primary support.

Another picture of one of the primary supports I replaced.
JJJ
Last pic of new support. In the background you can see the two jacks. That is where I put the first secondary support post.